RBI NOTES
  • Economics
  • Finance
  • Management
  • Current Affairs
  • Social Issues
Sign In
  • My Saves
  • My Feed
  • My Interest
Monday, Jun 23, 2025
RBI NOTESRBI NOTES
Font ResizerAa
  • Economics
  • Finance
  • Management
  • Current Affairs
  • Social Issues
Search
  • Categories
    • Economics
    • Finance
    • Management
    • Current Affairs
    • Social Issues
  • Personalized
    • My Saves
    • My Feed
    • My Interests
    • History
Have an existing account? Sign In
rbi grade B salary
RBI NOTES > Blog > Uncategorized > MNRE Reimposes ALMM for Solar PV Modules to Boost Domestic Manufacturing
Uncategorized

MNRE Reimposes ALMM for Solar PV Modules to Boost Domestic Manufacturing

Last updated: August 31, 2024 9:56 am
Share
SHARE

Introduction: The Ministry of New and Renewable Energy (MNRE) has re-imposed the Approved List of Models & Manufacturers (ALMM) for Solar Photovoltaic (PV) Modules, effective from April 1, 2024. This mandate requires the procurement of solar modules from manufacturers listed in the ALMM to boost domestic manufacturing and restrict imports.

Background:

  • ALMM Order 2019: Issued on January 2, 2019, by MNRE, the ALMM Order specifies models and manufacturers of solar PV modules (List-I) and solar cells (List-II). ALMM enlistment requires valid Bureau of Indian Standards (BIS) registration.
  • Mandate: Only models and manufacturers on the ALMM are eligible for use in Government Projects or Government-assisted Projects in India.
  • Temporary Suspension: The ALMM Order was temporarily suspended for FY 2023-24.
  • Exemption: Projects commissioned by March 31, 2024, are exempted from the ALMM requirement. Imports were allowed until this date due to the demand-supply gap in domestic manufacturing.

Applicability of ALMM:

  • Government-Supported Schemes: The ALMM applies to government-supported schemes and projects where electricity distribution companies (discoms) procure electricity.
  • Key Schemes: Includes the Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme and the PM Surya Ghar Muft Bijli Yojana.
  • Exclusions: ALMM does not apply to projects constructed under open access or captive projects by private companies.

About Ministry of New and Renewable Energy (MNRE):

  • Union Minister: Raj Kumar Singh (Constituency – Arrah, Bihar)
  • Minister of State: Bhagwanth Khuba (Constituency – Bidar, Karnataka)
  • Secretary: Bhupinder Singh Bhalla

TAGGED: Hot, Solar
Share This Article
Facebook Twitter Copy Link Print

You Might Also Like

RBI grade B syllabus
Uncategorized

Global and National Reports

9 Min Read
RBI grade B previous year papers
Uncategorized

New Parliamentary Committees for 2024-25: Key Details and Leadership

2 Min Read
RBI grade B previous year papers
Uncategorized

Innovative Bond Aims to Save the Amazon by Linking Returns to Carbon Removal

3 Min Read
RBI grade B previous year papers
Uncategorized

RBI Expands Liberalized Remittance Scheme for IFSCs Like GIFT City

2 Min Read

RBI NOTES

Welcome to RBI Notes, your ultimate resource for comprehensive and reliable competitive exam preparation materials. 

Quick Links

  • About Us
  • Contact Us
  • Privacy Policy

Download Free Cheatsheet

© 2016-2024 RBI NOTES ALL RIGHTS RESERVED.

Welcome Back!

Sign in to your account

Login with Google

Register Lost your password?